thumbnail image

FLERIMG S.R.L.

  • Home
  • Services
  • Projects
  • About Us
  • Contact
  • …  
    • Home
    • Services
    • Projects
    • About Us
    • Contact

FLERIMG S.R.L.

  • Home
  • Services
  • Projects
  • About Us
  • Contact
  • …  
    • Home
    • Services
    • Projects
    • About Us
    • Contact
  • Featured Projects

    Building the future, one project at a time.

  • Our Gallery

    Explore a curated selection of our most representative projects, where quality and innovation come together.

  • Case Studies

    We conduct in-depth analyses of the planning and execution of our most challenging projects. Through these case studies, we demonstrate our ability to address complex challenges and deliver exceptional results. Each case reflects our commitment to innovation and continuous improvement, ensuring that every client receives customized and effective solutions.

    All
    Case Studies
    Featured projects
    CIM 720 REDUCTION (REPSOL)

    CIM 720 REDUCTION (REPSOL)

    The company implemented the CIM 720 reduction project, which included the installation of a heater and the addition of a cover to the gas plant's operating process. These interventions optimized operating conditions, improved system efficiency, and ensured more stable and reliable operation during critical process stages.
    IMPLEMENTATION OF THE THIRD UCG AT THE COLPA COMPRESSION STATION (YPFB TRANSPORTE)

    IMPLEMENTATION OF THE THIRD UCG AT THE COLPA COMPRESSION STATION (YPFB TRANSPORTE)

    The company implemented the fourth and fifth gas compression units at the Colpa Compression Station to increase operational capacity and ensure a continuous energy supply. The project included the installation of new compression equipment, a complete upgrade of the existing infrastructure, and the integration of advanced control and monitoring systems.
    SAIPURÚ STATION UPGRADE (YPFB TRANSPORTE)

    SAIPURÚ STATION UPGRADE (YPFB TRANSPORTE)

    The company successfully completed the project to upgrade and modernize two Solar brand turbochargers, with the goal of improving the reliability, efficiency, and operational continuity of the gas compression system. The work included modernizing critical components, completely updating the control and automation systems, and optimizing thermo-mechanical performance parameters.
    ASSEMBLY AND COMMISSIONING OF PALOMETA WELL X6 (SUBCONTRACTOR - END CLIENT YPFB CHACO S.A.)

    ASSEMBLY AND COMMISSIONING OF PALOMETA WELL X6 (SUBCONTRACTOR - END CLIENT YPFB CHACO S.A.)

    The company carried out the complete assembly of the systems associated with the Palometa X6 well, encompassing all activities related to instrumentation, equipment configuration, and functional testing. The project included the installation and calibration of measurement and control instruments, the integration of operating systems, and the commissioning process to ensure safe, efficient performance in accordance with established parameters.
    INSTRUMENTATION DISASSEMBLY AND ASSEMBLY – WELL X3 CHURUMA (SUBC. / END CLIENT YPFB CHACO S.A.)

    INSTRUMENTATION DISASSEMBLY AND ASSEMBLY – WELL X3 CHURUMA (SUBC. / END CLIENT YPFB CHACO S.A.)

    The company carried out the dismantling and subsequent reassembly of the instrumentation equipment and associated facilities at the X3 Churuma Well. The activities included the safe removal of existing devices, the installation of new measurement and control equipment, and the adaptation of the lines and auxiliary systems required for its proper operation.

    UPGRADING OF VILLAMONTES POLIDUCTOS STATION (YPFB TRANSPORTE)

    UPGRADING OF VILLAMONTES POLIDUCTOS STATION (YPFB TRANSPORTE)

    The project consisted of a comprehensive upgrade of the Villamontes Station, part of the multi-product pipeline system. The work included modernizing its facilities, optimizing the existing infrastructure, and implementing improvements aimed at increasing operational safety, reliability, and system efficiency.

    These activities strengthened the continuity of hydrocarbon transport, ensuring compliance with technical and regulatory standards, and guaranteeing safer and more efficient operation of the station.
  • Certifications and Achievements

    A constant commitment to excellence in every project.

    ISO 9001

    Our ISO 9001 certification ensures that we adhere to the highest quality standards in project management, delivering reliable and sustainable results.

    ISO 45001

    Holding ISO 45001 certification reflects our strong commitment to occupational health and safety, ensuring safe working conditions, effective risk identification, and continuous improvement in preventive performance.

    ISO 14001

    Our environmental management system, certified under ISO 14001, strongly supports our commitment to environmental protection. It ensures efficient and responsible environmental management across all operations. Through sustainable practices, we continuously work to reduce the environmental impact of our projects and contribute to sustainable development.

    Proyectos Sustentables

    Our dedication to sustainability is reflected in numerous projects that comply with environmental regulations and promote the responsible use of resources.

    Inicio
    Publicaciones
    Encuéntranos
    Contáctanos
Cookie Use
We use cookies to ensure a smooth browsing experience. By continuing we assume you accept the use of cookies.
Learn More